Model NO.: TGTA-002
Element: Embroidery
Age Group: Adult
Base: Steel Cross Base
Ribs: 8 Aluminum
Shape: Square
Apply Area: Garden, Villa, Patio Area, Outdoor, Swimming-Pool
Condition: New
Trademark: TOPGLORY
Transport Package: Carton Box Packaged
Origin: Guangdong, Foshan
HS Code: 6601100000
Model NO.: TGTA-002
Element: Embroidery
Age Group: Adult
Base: Steel Cross Base
Ribs: 8 Aluminum
Shape: Square
Apply Area: Garden, Villa, Patio Area, Outdoor, Swimming-Pool
Condition: New
Trademark: TOPGLORY
Transport Package: Carton Box Packaged
Origin: Guangdong, Foshan
HS Code: 6601100000
Product Description 1.Specification: | Alu. stand pole: 63x93X2.0mm            Alu. hanging pole:48x55X2.0mm             8 Alu. ribs: 17x25X1.0mm             handle: alu.                           fabric: 250g/m2, with PA,with airvent, without flap with 360° rotating function,with steel cross base |
2.Material : | Fabric: Polyester / Nylon Coating: PU/PVC Frame: High quality steel frame(70# steel) with powder coating |
3.Color: | Any Pantone color or multi-colors can be customized. |
4.Size: | Fabric:160-300cm*8K or customized Pole diameter: 28/32mm Rib:4.0MM |
5.Logo:Â | We can make any logo upon your design. |
6.MOQ: | 10PCS |
7.OEMÂ Accepted | Yes |
8.Certification available: | SGS |
9.Payment Term: |  L/C, T/T, WESTERN UNION |
10. 20'GP /40'GP/40'HQ Container Loading | 120/240/280pcs |
Material Information
Fabric/Printing | Material: Polyester(Terylene ); Olefin ; Sunbrella Different design & colors & stripes & lattice Different printing (heat transfer printing & silk screen) & logo are available Finish: silver coating ,color coating , PU coating and PVC coating Density:160T,170T,180T,190T,210T |
Parasol fabric
To clean the fabric, fold down the parasol and wipe it with a soft cloth dampened in water. For heavily soiled areas, scrub with a sponge soaked in mild detergent and rinse with cold water.
Parasol base
Wipe clean with a soft cloth dampened in water and a mild washing-up detergent or soap, if necessary.
At the end of the season, empty out the sand, clean the parasol base and store it in a cool, dry place.
FAQ:
Production Lead Time.
1. High Season (September to April): 30-40 days .
2. Low Season (May to August): around 18-25 days .
3. We will come up with a detailed production schedule for each order and this schedule will be a platform for onward communication between customers and us.Â
Â
Payment Terms
1. 30% down payment before production and balance before shipment.Â
2. We can offer different pricing of FOB, CIF and C&F.Â
3. Cash, Ali Express Escrow, Paypal, West Union, Money Gram, Bank Transfer and L/C are all available.
 Product DescriptionÂ
1.Specification: | Alu. stand pole: 63x93X2.0mm            Alu. hanging pole:48x55X2.0mm             8 Alu. ribs: 17x25X1.0mm             handle: alu.                           fabric: 250g/m2, with PA,with airvent, without flap with 360° rotating function,with steel cross base |
2.Material : | Fabric: Polyester / Nylon Coating: PU/PVC Frame: High quality steel frame(70# steel) with powder coating |
3.Color: | Any Pantone color or multi-colors can be customized. |
4.Size: | Fabric:160-300cm*8K or customized Pole diameter: 28/32mm Rib:4.0MM |
5.Logo:Â | We can make any logo upon your design. |
6.MOQ: | 10PCS |
7.OEMÂ Accepted | Yes |
8.Certification available: | SGS |
9.Payment Term: |  L/C, T/T, WESTERN UNION |
10. 20'GP /40'GP/40'HQ Container Loading | 120/240/280pcs |
Material Information
Fabric/Printing | Material: Polyester(Terylene ); Olefin ; Sunbrella Different design & colors & stripes & lattice Different printing (heat transfer printing & silk screen) & logo are available Finish: silver coating ,color coating , PU coating and PVC coating Density:160T,170T,180T,190T,210T |
Parasol fabric
To clean the fabric, fold down the parasol and wipe it with a soft cloth dampened in water. For heavily soiled areas, scrub with a sponge soaked in mild detergent and rinse with cold water.
Parasol base
Wipe clean with a soft cloth dampened in water and a mild washing-up detergent or soap, if necessary.
At the end of the season, empty out the sand, clean the parasol base and store it in a cool, dry place.
FAQ:
Production Lead Time.
1. High Season (September to April): 30-40 days .
2. Low Season (May to August): around 18-25 days .
3. We will come up with a detailed production schedule for each order and this schedule will be a platform for onward communication between customers and us.Â
Â
Payment Terms
1. 30% down payment before production and balance before shipment.Â
2. We can offer different pricing of FOB, CIF and C&F.Â
3. Cash, Ali Express Escrow, Paypal, West Union, Money Gram, Bank Transfer and L/C are all available.
Â
Laundry Cart,Laundry Hamper ,Commercial Laundry Cart ,Laundry Sorter
Garden Furniture Sets Co., Ltd. , http://www.nbstorageshelf.com